Experiencing longer lead-times than normal
Newest version Espar / Eberspacher Airtronic M2-B4L 12v Commercial Air Heater With Installation Kit for Ford Transit
This the newest available B4L for Espar/Eberspaecher.
The new Airtronic family is the logical further development of the wildly successful Eberspaecher air heater. With its robust components and the latest control system, the Airtronic now features both functional expansions and a longer service life. A new brushless motor has extended service life to 5000 hours and its quieter. The fuel metering pump acoustics are also improved. This is a very nice heater!
The 2019 Airtronic M2-B4L also has altitude adjustment built-in. No more need for additional module.
Recommended controller: Included EasyStart Pro
Muffler kit included
Fuel type: Gasoline/Petrol
Voltage: 12 Volts
Max Power 4 kW
Contents:
- Eberspacher Airtronic D4L 12v Heater
- Fuel metering pump
- Fuel line/clamps
- Wire harnesses
- Stainless steel exhaust pipe
- Combustion intake pipe
- Flexible ducting - 0.5 meter
- Outlet grill
- Air outlet hood (90mm-straight)
- Screws, clips and plastic straps required for installation
- Installation manual
- Warranty documentation
Ideal for heating:
- Truck
- Van
- Campervan
- Mobile Workshop
- Tool Truck
Eberspacher / Espar Part Number:
- 20.2819.87.0400 (w/N.A. installation kit) / 20.1987.05.0000 (Heater only)
- 25 2720 80 0000 / 25 2720 80 00 00 / 252720800000 (Installation kit)